This is regarding the SUN E6500 server upgradation for our web based
application
We have some query and require your help.
We are going to upgrade the SUN E6500 server from
8 nos of 336 Mhz cpus to 22 nos of 464 Mhz cpus as recommended by SUN
and
8 GB or RAM to 40 GB of RAM as recommended by SUN
Also we are going to discard all our SSA112 and SSA114 arrays and replace
everyhting
with 6 numbers of A5200 array each having 7 nos of 36.4 GB harddisks
Now I would like to know that by increasing the cpus to 22 nos of 464 Mhz
and connecting
6 nos of A5200 arrays what will be the throughput??
Will there be any i/o bottlenecks or excessive i/o queueing.
How we calculate the throughput in the upgraded environment .....
Can you help us in giving some feedback....
In our present configuration we ran some sar commands for about 4 hours
giving a load
of 25000 transactions and we calculated the throughput as in the file
enclosed below...
Is this right ?? and how do now calculate keeping the upgraded
configuration in mind.
(See attached file: analysis.doc.doc)(See attached file: sard.xls)(See
attached file: saru.xls)
Thanks and Regards
K.JANAKIRAMAN
[demime 0.99c.1 removed an attachment of type application/octet-stream which had a name of analysis.doc.doc]
[demime 0.99c.1 removed an attachment of type application/X-MS-Excel which had a name of sard.xls]
[demime 0.99c.1 removed an attachment of type application/X-MS-Excel which had a name of saru.xls]
More information about the SunHELP
mailing list