On Wed, 6 Dec 2000, Dale Ghent wrote:
> before. In this case, trust the hardware status lights. You can replace
> the A1000 NVRAM battery hot. No need to bring the unit down.

Is the manual wrong, then?  The "Sun StorEdge A1000 and D1000 
Installation, Operations, and Service Manual" (2/98) says the system
must be powered down before the battery can be replaced.

Thanks for the other information, btw.